The data, to check and reuse

Every figure on the site comes from the datasets below. Reported volumes are from EirGrid and SONI; everything else is modelled with the assumptions on the method page (version 1.1 · October 2026). Free to reuse under CC BY 4.0 — please credit “Irish Grid (irishgrid.com), from EirGrid/SONI and CSO data”.

Wind dispatch-down, Ireland, by year

The one series the site uses: annual wind dispatch-down in the Republic of Ireland, with its source.

Reported
Data dictionary (8 columns)
year
Calendar year
method
"reported" (EirGrid/SONI annual report) or "provisional" (report not yet published)
wind_dispatch_down_gwh
Wind dispatch-down (curtailment + constraint), GWh
wind_pct_of_available
Dispatch-down as a percentage of available wind energy
constraint_share
Share caused by constraint rather than curtailment, 0–1; blank when not reported
source
Full citation
source_url
Link to the source document
notes
Caveats

Modelled cost and Bitcoin figures, by year

Compensation cost (low, central, high), the per-household equivalent, and the mining figures at the current market snapshot.

Reported and modelled
Data dictionary (19 columns)
year
Calendar year
volume_method
Basis of the volume: "reported" or "provisional"
wind_dispatch_down_gwh
Volume used, GWh (reported or provisional)
constraint_share_used
Constraint share used in the central case, 0–1
cost_low_eur
Modelled compensation, low case, €
cost_central_eur
Modelled compensation, central case, €
cost_high_eur
Modelled compensation, high case, €
cost_per_household_central_eur
Central cost ÷ 1841152 private households (Census 2022), €
replacement_cost_eur
Context only: constrained volume × €95/MWh
btc_price_eur
BTC price used, €
network_hashrate_ehs
Network hashrate used, EH/s
market_as_of
When the market snapshot was taken (ISO 8601)
market_live
false when the stored snapshot was used
btc_net
BTC a fleet would earn from the volume in a year, after pool fee
gross_revenue_eur
Gross mining revenue, before costs, €
annual_cost_eur
Modelled annual cost of the fleet (hardware, site, operations, charges, generator payments), €
net_eur
Gross revenue minus annual cost, €
break_even_price_eur
BTC price at which net = 0, €
method_version
Version of the method that produced the row

Assumptions

Every assumption behind the modelled figures, with its value and unit.

Reference
Data dictionary (4 columns)
key
Identifier
value
Value
unit
Unit
description
What it is

Generators on the map

The curated, partial list of large generators and interconnectors shown on the map. Locations are approximate.

Reference
Data dictionary (10 columns)
id
Identifier
name
Name
fuel_type
wind, gas, oil, hydro, storage, solar, imports (interconnector) or other
capacity_mw
Installed or rated capacity, MW
operator
Operator
lat
Latitude (approximate)
lng
Longitude (approximate)
region
County
is_major
Shown on the default map
note
Status note

The code that produces these files is public on GitHub. Reported figures are changed only by a public code change, so their history is visible there.