Open data
The data, to check and reuse
Every figure on the site comes from the datasets below. Reported volumes are from EirGrid and SONI; everything else is modelled with the assumptions on the method page (version 1.1 · October 2026). Free to reuse under CC BY 4.0 — please credit “Irish Grid (irishgrid.com), from EirGrid/SONI and CSO data”.
Wind dispatch-down, Ireland, by year
The one series the site uses: annual wind dispatch-down in the Republic of Ireland, with its source.
Data dictionary (8 columns)
- year
- Calendar year
- method
- "reported" (EirGrid/SONI annual report) or "provisional" (report not yet published)
- wind_dispatch_down_gwh
- Wind dispatch-down (curtailment + constraint), GWh
- wind_pct_of_available
- Dispatch-down as a percentage of available wind energy
- constraint_share
- Share caused by constraint rather than curtailment, 0–1; blank when not reported
- source
- Full citation
- source_url
- Link to the source document
- notes
- Caveats
Modelled cost and Bitcoin figures, by year
Compensation cost (low, central, high), the per-household equivalent, and the mining figures at the current market snapshot.
Data dictionary (19 columns)
- year
- Calendar year
- volume_method
- Basis of the volume: "reported" or "provisional"
- wind_dispatch_down_gwh
- Volume used, GWh (reported or provisional)
- constraint_share_used
- Constraint share used in the central case, 0–1
- cost_low_eur
- Modelled compensation, low case, €
- cost_central_eur
- Modelled compensation, central case, €
- cost_high_eur
- Modelled compensation, high case, €
- cost_per_household_central_eur
- Central cost ÷ 1841152 private households (Census 2022), €
- replacement_cost_eur
- Context only: constrained volume × €95/MWh
- btc_price_eur
- BTC price used, €
- network_hashrate_ehs
- Network hashrate used, EH/s
- market_as_of
- When the market snapshot was taken (ISO 8601)
- market_live
- false when the stored snapshot was used
- btc_net
- BTC a fleet would earn from the volume in a year, after pool fee
- gross_revenue_eur
- Gross mining revenue, before costs, €
- annual_cost_eur
- Modelled annual cost of the fleet (hardware, site, operations, charges, generator payments), €
- net_eur
- Gross revenue minus annual cost, €
- break_even_price_eur
- BTC price at which net = 0, €
- method_version
- Version of the method that produced the row
Assumptions
Every assumption behind the modelled figures, with its value and unit.
Data dictionary (4 columns)
- key
- Identifier
- value
- Value
- unit
- Unit
- description
- What it is
Generators on the map
The curated, partial list of large generators and interconnectors shown on the map. Locations are approximate.
Data dictionary (10 columns)
- id
- Identifier
- name
- Name
- fuel_type
- wind, gas, oil, hydro, storage, solar, imports (interconnector) or other
- capacity_mw
- Installed or rated capacity, MW
- operator
- Operator
- lat
- Latitude (approximate)
- lng
- Longitude (approximate)
- region
- County
- is_major
- Shown on the default map
- note
- Status note
The code that produces these files is public on GitHub. Reported figures are changed only by a public code change, so their history is visible there.